Prahlad D Pant

Research Support

Grant: #20397A Investigators:Pant, Prahlad 03-01-2004 -09-30-2006 Federal Highway Administration Crash Base Rates for Intersections in Ohio Role:PI $169,551.00 Closed Level:Federal

Grant: #11859/Adden C Investigators:Pant, Prahlad 10-13-2002 -06-30-2005 Federal Highway Administration Validation of the Ohio Department of Transportation Sufficiency Rating System Role:PI $76,572.00 Closed Level:Federal

Grant: #9894/C Investigators:Pant, Prahlad 06-12-2000 -05-30-2005 Federal Highway Administration Dilemma Zone Protection and Signal Coordination at Closely-Spaced High Speed Signalized Intersections Role:PI $171,094.00 Closed Level:Federal

Grant: #9881/Adden B Investigators:Pant, Prahlad 06-12-2000 -12-31-2002 Federal Highway Administration Rational Schedule of Base Accident Rates for Rural Highways in Ohio - Phase II Role:PI $195,393.00 Closed Level:Federal

Grant: #9917/Adden. A Investigators:Pant, Prahlad 06-16-2000 -06-16-2001 Federal Highway Administration Implementation and Testing of the Travel Time Prediction System Role:PI $211,663.00 Closed Level:Federal

Grant: #7522/Adden I Investigators:Pant, Prahlad 08-01-1994 -12-31-2000 Department of Transportation Portable Real-Time Traffic Control System for Highway Work Zones Role:PI $748,810.00 Closed Level:Federal

Grant: #8645/Adden C Investigators:Pant, Prahlad 03-17-1997 -07-31-2001 Federal Highway Administration Dilemma Zone Protection and Signal Coordination at High Speed Intersections Role:PI $122,971.00 Closed Level:Federal

Grant: #8792/Adden. B Investigators:Pant, Prahlad 12-01-1997 -12-01-1999 Department of Transportation Warning System for Traffic Signals with Lost Power Role:PI $52,428.00 Closed Level:Federal

Grant: #8843/Adden. B Investigators:Pant, Prahlad 01-19-1998 -04-19-2000 Department of Transportation Rational Schedule of Base Accident Rates for Rural Highways in Ohio (Phase I) Role:PI $80,830.00 Closed Level:Federal